Maison Craft Rénovation Maison Craft Rénovation

Residential renovation — Montreal

Know what’s included, what it costs and what could change — before your renovation begins.

Maison Craft plans your renovation projects — kitchen, bathroom, basement, whole-home renovation or custom project — with a written scope, documented assumptions, and changes presented for approval before they’re carried out.

Renovated kitchen and living area with a white island, natural wood flooring and large windows

Our core services

One method, for every service

Kitchen, bathroom, basement and whole-home or multi-room renovations are our core services. Each follows the same method: a defined scope, documented assumptions, and clear options. Maison Craft also incorporates complementary interior renovation work as part of a larger project.

The Maison Craft Difference

What you know before you sign

Most renovation disputes start with an early blur: what was included, what wasn’t, and what changed along the way. Our method addresses that blur directly.

01

Written scope

Every proposal spells out exactly what work is included, room by room and line by line.

02

Documented assumptions

What we assume about existing conditions (structure, plumbing, electrical) is written down, not implied.

03

Options, not just one choice

Where more than one approach is possible, each is presented with its cost and timeline differences.

04

Documented changes

A hidden condition is explained as soon as it’s discovered, with a clear choice presented before any work proceeds.

How it works

A four-step process

  1. 1

    Free pre-qualification

    A first conversation, at no cost, to understand your project and confirm it fits our offer and our service area.

  2. 2

    Free first visit

    An on-site visit, also at no cost, to assess the space and discuss your goals and the scope you have in mind.

  3. 3

    Detailed project definition

    Precise measurements and technical documentation of the project, starting at $149 CAD (taxes extra) — credited to your project if you sign within 45 days.

  4. 4

    Contractual proposal

    A written proposal detailing scope, assumptions, materials and price, ready to sign.

Budget control

What protects your budget

A renovation budget rarely slips because of one isolated surprise — it slips when decisions aren’t documented in time.

Scope fixed before work begins

The proposal details the items included, reducing diverging interpretations once the site work starts.

Explicit assumptions

Assumptions about existing conditions are written down, along with the flexibility built in if they prove inaccurate.

Changes submitted for approval

Any change to scope or price is presented to you before it’s carried out — never after the fact.

Hidden conditions explained quickly

An unexpected discovery (structure, moisture, wiring) is communicated as soon as it’s identified, along with the available options.

Additional capability

Special Projects

Complete renovations, custom interior projects and multi-room transformations depend on existing conditions, applicable permits and the specialized professionals required. Responsibilities are documented before signing.

These projects aren’t priced instantly — they start with a conversation about feasibility.

Frequently Asked Questions

Your questions, answered directly

How is the price of a renovation determined?

Price is based on the scope we define together, the materials chosen, and the documented assumptions about existing conditions. A range is presented in the written proposal, along with what could move it.

What happens if something unexpected is discovered during construction?

The condition found (structural, plumbing, moisture, etc.) is documented and explained as soon as it’s identified. Options and their impact on price or timeline are presented to you before any work proceeds.

Do you work with condominiums and co-ownership syndicates?

Yes. These projects usually involve additional steps with the syndicate (bylaws, insurance, work-hour restrictions), which are clarified during the proposal stage.

Do I need a permit for my project?

That depends on the municipality, borough, building type and scope of work. A permit or authorization may be required for projects affecting structure, plumbing, electrical or the building envelope; requirements must be verified with the applicable authority before work begins.

How long does a full renovation take?

Duration depends on the agreed scope and the availability of materials and trades; it’s estimated in the proposal and confirmed at scheduling.

See all questions

Start a Project

Tell us about your project

A few questions, split into short steps, help us understand your project before our first conversation.

Online requests aren’t active yet. Contact us directly to start your project: